Ask the AI
Paper IIHuman Geography of India53 min read

Resources of India

Land, surface and ground water, energy, minerals, biotic and marine resources, forest and wildlife resources and their conservation, energy crisis

Land and Water ResourcesGroundwaterCoalfields of IndiaPetroleum and Natural GasHydel and Nuclear PowerSolar and Wind EnergyEnergy Crisis and EfficiencyMineral Belts and Critical MineralsMarine Resources and Blue EconomyForest and Wildlife Resources

Resources: Meaning and Classification

A resource is anything in the environment that people can use to meet their needs with the technology, institutions and demand of their time. Erich Zimmermann (World Resources and Industries, 1933) put it as "resources are not, they become": coal was black rock until the steam engine, and lithium mattered little before the battery.

  • By origin: biotic resources such as forests, wildlife, fisheries and livestock, and abiotic resources such as land, water, minerals and fossil fuels.
  • By renewability: renewable flows such as sunlight, wind, water and forests, which last if used within their rate of renewal, and non-renewable stocks such as coal, oil and metallic ores, which use depletes, though metals can be recycled.
  • By stage of development: potential resources, known but unused, such as most of the hydel potential of Arunachal Pradesh, developed resources that are surveyed and in use, and reserves, the part of a stock that can be worked profitably with present technology.

India has 2.4 per cent of the world's land and about 4 per cent of its renewable fresh water but about 18 per cent of its people. Its rocks are rich in coal, iron ore, bauxite, chromite and limestone and poor in oil, gas, copper and the critical minerals of the energy transition. Pressure on land and water, dependence on imported energy and the need for conservation therefore shape the use of every resource.

Land Resources

Land Area, Reporting Area and Land Use

India's geographical area is 328.76 million hectares (Mha), about 2.4 per cent of the world's land, supporting about 18 per cent of humanity. Land-use statistics cover only the reporting area, for which land records exist: 306.93 Mha in 2023-24 (provisional), about 93 per cent of the total, excluding territory under foreign occupation and some unsurveyed tracts. It is divided into nine classes (Land Use Statistics at a Glance 2023-24):

Class (2023-24, provisional)Area (Mha)Share of reporting area (per cent)
Forests72.0223.5
Area under non-agricultural uses28.559.3
Barren and unculturable land16.595.4
Permanent pastures and other grazing land10.213.3
Land under miscellaneous tree crops and groves2.951.0
Culturable waste land11.593.8
Fallow land other than current fallows11.163.6
Current fallows14.914.9
Net sown area138.9945.3
  • A closed frontier: net sown area has stayed between about 138 and 142 Mha since 2011-12, so output grows through multiple cropping: from 2011-12 to 2023-24 cropping intensity rose from 139 to 157 per cent and net irrigated area from 66.0 to 82.4 Mha.
  • Built-up spread: non-agricultural uses grew from 26.36 to 28.55 Mha over the same years, while culturable waste fell from 12.64 to 11.59 Mha.
  • Forests in land records: a legal category, distinct from satellite-mapped forest cover (21.76 per cent of the geographical area, India State of Forest Report 2023).

Land as a Limiting Resource: the Uneven Ecological Footprint

The ecological footprint (Wackernagel and Rees, 1996) is the productive area, in global hectares (gha), needed to supply a population's consumption and absorb its wastes, compared with biocapacity, the productive area available. In the Global Footprint Network's 2025 results India's footprint is 1.13 gha per person, less than half the world average of 2.51 gha, yet its biocapacity is only 0.38 gha, so India demands about three times what its land regenerates. Net sown area is about 0.1 hectare per person. The pressure is uneven:

  • Social and urban: affluent households consume far more than the rural poor, and cities draw food, water, power and sand from distant hinterlands while building over farmland, lakes and floodplains around Delhi and Bengaluru.
  • Mining regions: opencast mining in Jharkhand, Odisha and Chhattisgarh clears forest and displaces tribal people to supply power and steel used elsewhere.
  • Green Revolution belt: Punjab and Haryana pump groundwater at 156 and 137 per cent of the extractable resource (CGWB, 2025) and export it as virtual water in rice and wheat.

Land-use change can promote eco-development at each level. Nationally, the National Forest Policy (1988) seeks a third of the area under forest or tree cover, and at the 14th Conference of the Parties to the UN Convention to Combat Desertification (New Delhi, September 2019) India announced the goals of land degradation neutrality and restoring 26 Mha of degraded land by 2030. Regionally, shelterbelts, dune fixation and silvipasture restore the Thar. Locally, watershed treatment, closing commons to open grazing, agroforestry and fuel and fodder plantations on culturable waste raise biomass, recharge and incomes.

Land Degradation and Desertification

The Desertification and Land Degradation Atlas of India (2021) of ISRO's Space Applications Centre found 97.85 Mha, 29.77 per cent of the geographical area, undergoing degradation in 2018-19, up from 96.40 Mha in 2011-13 and 94.53 Mha in 2003-05. Degradation in drylands, which cover about 69 per cent of India, is desertification: 83.69 Mha in 2018-19. Water erosion is the leading process (11.01 per cent of the geographical area), followed by vegetation degradation (9.15 per cent) and wind erosion (5.46 per cent). Rajasthan, Maharashtra, Gujarat, Karnataka, Ladakh, Jharkhand, Odisha, Madhya Pradesh and Telangana, in that order, hold most of the degraded area, and over half of Jharkhand, Rajasthan, Delhi, Gujarat and Goa is degrading, against under 10 per cent of Kerala, Assam, Bihar and Punjab.

  • Thar and Kachchh: wind erosion and shifting dunes from overgrazing, ploughing of marginal land and fuelwood cutting.
  • Semi-arid Deccan, Bundelkhand and the Chambal: sheet and gully erosion on shallow soils, and ravines eating into farmland along the Chambal.
  • Canal commands: waterlogging and salinity in the Indira Gandhi Canal and parts of the Punjab, Haryana and western Uttar Pradesh plains.
  • Mining belts, hills and cold desert: pits and dumps in Jharkhand and Odisha, vegetation loss from shortened jhum cycles in Mizoram, and wind action in Ladakh.

The consequences are lower yields, silted reservoirs, dust storms, reduced recharge, scarce fodder and fuel, and distress migration.

Water Resources

Precipitation, Total and Utilisable Water

Precipitation, the source of all fresh water, is about 3,729 billion cubic metres (BCM) a year in the Central Water Commission's 2024 compilation (older estimates said 4,000 BCM), over 75 per cent of it in June to September. The CWC's Assessment of Water Resources of India (2024) puts the average annual water resources of the river basins at 2,115.95 BCM. Terrain and seasonality limit use: utilisable surface water is 690 BCM (National Commission for Integrated Water Resources Development, 1999) and annual groundwater recharge 447 BCM (2024 assessment), about 1,137 BCM in all. India has more than 18 per cent of the world's population but only 4 per cent of its renewable water (National Water Policy 2012).

Basin-wise Availability

BasinAverage annual resources (BCM)Utilisable surface water (BCM)Per capita, 2025 (cubic metres)
Brahmaputra592.322412,325
Ganga581.75250981
Barak and others93.65not given9,146
Godavari129.1776.31,448
Krishna86.3258860
Cauvery26.5319548
East-flowing rivers, Pennar to Kanyakumari27.0616.5364

The Ganga-Brahmaputra-Meghna system carries about 1,268 BCM, 60 per cent of the total (CWC, Water Sector at a Glance 2024), but the Brahmaputra's narrow, flood-prone valley allows little storage. Small, seasonal, densely farmed peninsular basins such as the Cauvery, Pennar and Sabarmati fall far below 1,000 cubic metres per person, while the short west-flowing Western Ghats rivers carry about 227 BCM.

Per Capita Availability and Water Stress

Malin Falkenmark's indicator (1989) treats a country as water-stressed below 1,700 cubic metres per person a year, water-scarce below 1,000 and in absolute scarcity below 500. India had 1,747 cubic metres per person at the 2011 population, and the CWC projects 1,573 for 2021, 1,446 for 2031 and 1,300 for 2051, so India is already water-stressed. The 1999 National Commission projected demand of 973 to 1,180 BCM by 2050, against 1,137 BCM utilisable, and agriculture takes about 70 per cent of abstraction.

Groundwater

Distribution of Groundwater

Occurrence depends on rock type. The CGWB recognises 14 principal and 42 major aquifers.

  • Alluvial plains: the thick, porous Indo-Ganga-Brahmaputra alluvium is the largest store, with a specific yield of about 10 per cent in younger alluvium and 16 per cent in piedmont (kandi) gravels, recharged by rain, rivers and canal seepage.
  • Hard-rock peninsula: fissured rocks such as granite, gneiss and basalt cover nearly two-thirds of the country. Water sits only in the weathered and fractured upper zone, with a specific yield of 1.5 to 3 per cent in weathered granite and 0.35 per cent in massive rock, so wells fail quickly in drought.
  • Arid west and coasts: saline, poorly recharged aquifers in western Rajasthan and Kachchh, and coastal aquifers open to seawater intrusion.

Dynamic Ground Water Resource Assessment 2025

The CGWB's annual assessment for 2025 (October 2025) gives annual recharge of 448.52 BCM, extractable resources of 407.75 BCM and extraction of 247.22 BCM, a stage of extraction of 60.63 per cent. Irrigation takes 215.10 BCM (87 per cent), and wells and tube wells irrigated 62.94 per cent of net irrigated area in 2023-24 (provisional).

Category (stage of extraction)Assessment unitsPer cent
Safe (below 70 per cent)4,94673.14
Semi-critical (70 to 90)75811.21
Critical (90 to 100)2012.97
Over-exploited (above 100)73010.80
Saline1271.88

Stress is concentrated in the north-west (Punjab 156.4, Haryana 136.8, Delhi 92.1 per cent), where pumping outpaces ample recharge, the arid west (Rajasthan 147.1 per cent), where recharge is small, and the hard-rock south (Tamil Nadu 73.5, Karnataka 66.5 per cent). Punjab has 111 of its 153 units over-exploited. Over-exploited units rose from 839 in 2004 to 1,186 in 2017 and fell to 730 in 2025, helped in places by recharge works and good rainfall, yet half the monitoring wells showed a fall in pre-monsoon 2024 against the 2014-23 mean.

Causes of Depletion

  • Cropping and prices: assured procurement of rice and wheat and returns from sugarcane keep water-hungry crops in semi-arid Punjab, Haryana, western Uttar Pradesh and Maharashtra.
  • Cheap power and pumps: free or flat-rate farm electricity removes the cost of extra pumping, and submersible pumps chase falling water tables.
  • Property regime: groundwater, the National Water Policy 2012 notes, is still treated as individual property and exploited without regard to sustainability.
  • Geology, lost recharge and urban demand: hard-rock aquifers store little, paving and encroached tanks cut infiltration, and short municipal supply drives households and industries to deep borewells.

Groundwater Contamination

The CGWB's Annual Ground Water Quality Report 2025 (2024 samples) found nitrate above 45 mg per litre in 20.7 per cent of samples, fluoride above 1.5 mg per litre in 8.05 per cent and excess salinity in 7.23 per cent.

ContaminantMain areasOrigin and health effect
NitrateRajasthan, Haryana, Punjab, Gujarat, Maharashtra, shallow Ganga plain aquifersFertiliser, animal waste and sewage, blue baby syndrome in infants
FluorideRajasthan, Gujarat, Karnataka, Andhra Pradesh, Telangana, Tamil NaduGeogenic, from granite and gneiss, dental and skeletal fluorosis
ArsenicWest Bengal, Bihar, Uttar Pradesh, Assam, Punjab, ChhattisgarhGeogenic, mainly in Ganga-Brahmaputra alluvium, skin lesions and cancers
UraniumPunjab (over half of samples above 30 parts per billion), Haryana, Delhi, RajasthanMainly geogenic, aggravated by depletion, kidney damage

In fast-growing cities contamination is a public health issue. Leaking sewers and septic tanks seep nitrate and pathogens into shallow aquifers, landfills such as Ghazipur in Delhi leak leachate, effluent drains such as Ludhiana's Buddha Nullah carry heavy metals, and over-pumping draws saline water from depth or the sea. The urban poor, reliant on unmonitored borewells and tankers, suffer most. Remedies are sewerage and faecal sludge treatment, scientific landfills, protected well fields, fortnightly CGWB quality alerts and piped treated supply.

Management of Groundwater

  • Atal Bhujal Yojana: launched on 25 December 2019 with Rs 6,000 crore for 2020-21 to 2024-25, half a World Bank loan, in 8,220 water-stressed gram panchayats of 80 districts in Haryana, Gujarat, Karnataka, Madhya Pradesh, Maharashtra, Rajasthan and Uttar Pradesh. It promotes panchayat-led, demand-side management and gives better-performing panchayats more funds.
  • Mapping and regulation: the National Aquifer Mapping and Management Programme, heliborne surveys of about 1 lakh sq km of north-west India, and a Model Bill for state groundwater laws.
  • Recharge: the Master Plan for Artificial Recharge to Groundwater 2020 envisages about 1.42 crore structures to harness 185 BCM of monsoon rain.
  • Demand side: separate electricity feeders for farm pumps (suggested by the National Water Policy 2012), later paddy transplanting under the Punjab Preservation of Subsoil Water Act, 2009, micro-irrigation and crop diversification.

Water Management and the Freshwater Crisis

The Freshwater Crisis and the National Water Policy 2012

The crisis combines falling per capita availability, seasonal rain, a water-rich east and water-short west and south, groundwater overdraft, pollution, wasteful flood irrigation and urban shortage. Chennai declared "Day Zero" on 19 June 2019 when its four main reservoirs ran dry, and NITI Aayog's Composite Water Management Index (2018) projected demand at twice the available supply by 2030. The National Water Policy 2012 sets out the blueprint:

  • water as a common pool resource held by the state under the public trust doctrine, with a National Framework Law
  • drinking water and sanitation as pre-emptive needs, then other basic needs, food security and minimum ecological flows
  • the river basin as the planning unit, with integrated water resources management
  • demand management, volumetric pricing by statutory Water Regulatory Authorities, water users' associations and reuse of treated water.

Jal Shakti Abhiyan, Rainwater Harvesting and Watersheds

The Jal Shakti Abhiyan began on 1 July 2019 in 1,592 blocks of 256 water-stressed districts and became Jal Shakti Abhiyan: Catch the Rain, covering all districts, on 22 March 2021. Mission Amrit Sarovar (24 April 2022) sought 75 rejuvenated water bodies per district, and by 2026 its portal reported 68,827 completed against a target of 50,000. Telangana's Mission Kakatiya (2015) set out to restore 46,531 tanks, and Chennai mandates rooftop harvesting. The watershed, which contains the whole chain of runoff, erosion and recharge, suits village-level planning, and in the hills takes the form of terracing, check dams and springshed management.

Interlinking of Rivers as a Resource Strategy

Interlinking would move water from surplus Himalayan and Mahanadi-Godavari basins to the deficit south and west. The National Perspective Plan (1980) underlies the 30 links identified by the National Water Development Agency, and the Ken-Betwa link, whose foundation stone was laid in December 2024, is the first under way. Since weak monsoons often hit donor and recipient basins together, it can supplement but not replace recharge, efficiency and demand management.

Water Conflicts, River Boards and Local Solutions

Water is a State subject (Entry 17, State List), subject to Union regulation of inter-state rivers (Entry 56, Union List). The River Boards Act, 1956 provides only for advisory boards, and boards with real functions exist by special arrangement: the Bhakra Beas Management Board (1966, renamed 1976), the Krishna and Godavari River Management Boards under the Andhra Pradesh Reorganisation Act, 2014, whose jurisdiction the Centre notified in July 2021, and the Cauvery Water Management Authority (1 June 2018), set up after the Supreme Court's judgment of 16 February 2018. Boards are controversial because states fear losing control of their dams and canals and riparian states distrust each other's representation.

Scarcity is local, so solutions must fit place:

  • village water budgets and crop planning in hard-rock Maharashtra and Karnataka
  • ice stupas in Ladakh and springshed recharge in Sikkim
  • desalination and wastewater reuse in coastal cities such as Chennai.

Energy Profile of India

India was the world's third-largest energy consumer in 2025, using 933.9 million tonnes of oil equivalent: coal 59.0 per cent, oil 27.9, natural gas 6.1, other renewables 3.9, hydroelectricity 1.6 and nuclear 1.5 (Energy Institute data, cited by PPAC). Use per head was 0.6 tonnes of oil equivalent, against 3.19 in China and 6.45 in the United States. Per capita electricity consumption rose from 957 kWh in 2013-14 to 1,460 kWh in 2024-25 (Ministry of Power). Non-fossil sources crossed half of installed capacity in June 2025, yet coal generated about 70 per cent of utility electricity in 2025-26.

Installed capacity, 31 July 2026 (CEA)GWPer cent
Coal and lignite230.841.8
Gas and diesel20.73.8
Nuclear8.81.6
Large hydro (including 7.4 GW of pumped storage)52.19.4
Solar164.629.8
Wind58.110.5
Bio-power, waste to energy and small hydro16.93.1
Total552.0100

Coal

Types and Grades

Coal ranks by carbon content from anthracite through bituminous and sub-bituminous to lignite. In India three groups matter.

  • Gondwana coal: bituminous and sub-bituminous coal of the Permian Barakar and Raniganj measures in faulted troughs of the Peninsular shield, almost all of India's coal, low in sulphur but high in ash.
  • Tertiary coal: much younger coal of the North-East, classed by the Ministry of Coal as high-sulphur coal, which limits its use.
  • Lignite: Tertiary brown coal of Tamil Nadu, Rajasthan and Gujarat.

Coking coal is graded by ash content, and non-coking coal by gross calorific value (GCV) from G1 (above 7,000 kcal/kg) to G17. About 71 per cent of measured non-coking resources fall in grades G9 to G14 (3,100 to 4,900 kcal/kg) (1 April 2023), so most Indian coal is low-grade steam coal.

Reserves and Distribution

The Geological Survey of India's National Coal Inventory 2025 put coal resources at 400.72 billion tonnes on 1 April 2025, to a depth of 1,200 m, in 64 coalfields (45 Gondwana and 19 Tertiary). Lignite resources were 47.37 billion tonnes in 15 fields. By state, Odisha (101.0 billion tonnes), Jharkhand (93.3) and Chhattisgarh (85.3) hold about 70 per cent, followed by West Bengal (34.4), Madhya Pradesh (33.6), Telangana (23.3) and Maharashtra (13.6).

Variety (1 April 2023)Billion tonnesMain states
Non-coking341.00Odisha, Chhattisgarh, Jharkhand, West Bengal, Madhya Pradesh, Telangana
Coking (prime 5.32, medium 28.53, semi 1.80)35.64Jharkhand (31.41, including all prime coking coal), Madhya Pradesh, West Bengal
High-sulphur Tertiary1.66Meghalaya, Assam, Nagaland, Arunachal Pradesh
Lignite47.37Tamil Nadu (37.60), Rajasthan (6.59), Gujarat (2.72)

The Coalfields and Their Distinctive Features

The Gondwana coalfields follow river valleys along old faulted troughs.

ValleyCoalfieldDistinctive features
Damodar (Jharkhand, West Bengal)RaniganjIndia's oldest coalfield, where the East India Company's John Sumner and Suetonius Grant Heatly found coal in 1774. Coking and non-coking coal.
DamodarJharia (Dhanbad)India's main store of prime coking coal, used at Jamshedpur and Bokaro. Underground fires since 1916 had consumed about 37 MT by 2007.
DamodarGiridihThe Karharbari seam has India's finest coking coal, with 9 to 12.6 per cent ash.
DamodarBokaro, Ramgarh, North and South KaranpuraUpper Damodar fields with Karanpura seams over 20 m thick. Bokaro and North Karanpura, with Jharia and Raniganj, are the most promising for coal-bed methane (ONGC).
Son (Madhya Pradesh, Uttar Pradesh)SingrauliThe exceptionally thick Jhingurda seam (130 to 162 m) in large opencast mines. High-ash coal (17 to 40 per cent) feeds pithead power stations.
Mahanadi (Odisha, Chhattisgarh)Talcher (Angul, Brahmani valley)Among the largest reserves of any Indian coalfield, mostly low-grade power coal.
MahanadiIb Valley (Jharsuguda)Coal found in 1900 while the Bengal Nagpur Railway bridged the Ib.
MahanadiKorba (Hasdeo valley)Main field of South Eastern Coalfields, whose Gevra mine (1981) is described as Asia's largest opencast mine.
Godavari-Wardha (Telangana, Maharashtra)SingareniCoal found near Yellandu in 1871. Singareni Collieries, 51 per cent owned by Telangana, is the main source of coal for the south.
Godavari-WardhaWardha valley (Chandrapur)Non-coking coal, mostly opencast, where near-surface coal is running out.
Satpura (Madhya Pradesh)Pench-Kanhan, Mohpani, Tawa, PathakheraThe main coking coal outside the Damodar valley.

Tertiary Coal and Lignite

Tertiary coal is mined around Margherita and Ledo in Upper Assam by North Eastern Coalfields and in the hills of Meghalaya, Nagaland and Arunachal Pradesh. Meghalaya's rat-hole mining through narrow tunnels has been banned by the National Green Tribunal but continues. Lignite was found at Neyveli in Tamil Nadu in 1934. NLC India runs opencast mines of 30.6 MT a year at Neyveli and Barsingsar (Bikaner) with 3,640 MW of lignite power stations beside them, and lignite is also mined at Giral and Kapurdi-Jalipa (Barmer) and in Kutch. Output was 45.13 MT in 2024-25.

Production, Imports and Quality

Coal output rose from 609.18 MT in 2014-15 to 1,047.52 MT in 2024-25, second only to China. Coal India produced 781.06 MT (about 75 per cent), Singareni 69.01 MT and captive and commercial mines 197.46 MT. Coking coal output that year was only 66.47 MT, and India imported 246.37 MT of coal in 2025-26, including 66.33 MT of coking coal for steel (provisional, Ministry of Coal).

  • Low heat value: Indian coal averages a GCV of about 4,500 kcal/kg against about 6,500 for Australian coal, so Indian stations burn about 0.7 kg of coal per kWh against 0.45 kg in the United States.
  • Washing: in 2024-25 coking coal washeries turned 15.91 MT of raw coal into 5.90 MT of washed coal, a yield of 37 per cent, which keeps steel plants dependent on imported low-ash coal.

After the Supreme Court quashed 214 of 218 coal block allocations (24 September 2014), blocks were auctioned for captive use, and in 2020 commercial mining was opened with no end-use restriction and 100 per cent FDI. The first auction, launched on 18 June 2020, allotted 18 mines, and the Ministry of Coal lists 141 mines auctioned in 14 rounds.

Location of Thermal Power Plants

  • Pithead plants: on the coalfield, sending power by wire: Vindhyachal (4,760 MW, India's largest coal station), Sasan Ultra Mega Power Project (3,960 MW) and Rihand (3,000 MW) in the Singrauli belt, and Korba, Sipat, Talcher and Ramagundam.
  • Load-centre plants: near cities and fed by coal trains, such as Dadri (1,820 MW) near Delhi, Tanda in eastern Uttar Pradesh and Barh near Patna. Delhi's Badarpur station, rated India's most polluting by the Centre for Science and Environment (2015), shut on 15 October 2018.
  • Coastal plants: at ports, burning imported coal, such as the Mundra Ultra Mega Power Project (Tata Power, 4,000 MW) and Adani's Mundra station (4,620 MW) in Kutch, and Udupi, Krishnapatnam and Tuticorin.

Ultra Mega Power Projects, supercritical coal stations of 4,000 MW or more awarded by competitive bidding, run only at Sasan (pithead) and Mundra (coastal). Krishnapatnam was deferred and Reliance quit Tilaiya.

Why Coalfields and Power Plants Do Not Coincide

  • Concentrated coal, dispersed demand: Odisha, Jharkhand, Chhattisgarh and parts of Madhya Pradesh supplied about 75 per cent of domestic coal despatch in 2021-22 (Ministry of Coal). The northern and southern regions had 98.3 GW of coal capacity in July 2026, yet apart from Singrauli and the Godavari valley they have little coal.
  • State-wise planning: state electricity boards built stations within their own borders long before the grid was unified on 31 December 2013 with the 765 kV Raichur-Solapur line.
  • Water: plants need cooling water, so they gather on rivers, reservoirs and coasts.
  • Imported coal: plants in Gujarat, Karnataka, Andhra Pradesh and Tamil Nadu burn coal brought by sea, and six ports (Dhamra, Mundra, Gangavaram, Paradip, Krishnapatnam and Jaigad) handle about 48 per cent of coal imports.
  • Pollution and ash: urban air quality pushes plants out of cities, while hauling high-ash coal means carrying waste, which favours pithead generation.
  • Rail strain: railways carried 66 per cent of coal despatch in 2021-22, and wagon shortages and congestion delay supply. The Coal Logistics Policy 2023 seeks nearest-mine linkages, rail-sea-rail movement and mechanised first mile connectivity for 90 per cent of coal by 2029-30.

The mismatch is partly inevitable, since geology fixed coal in the east-central plateau while people and industry spread across the plains and coasts. Coal by wire helps: the Talcher-Kolar HVDC line (1,450 km, 2,500 MW since 2007) carries pithead power from Odisha to the south.

Petroleum and Natural Gas

Sedimentary Basins and Oilfields

India has 26 sedimentary basins covering 3.4 million sq km on land and offshore (PPAC), and output comes from young, mainly Tertiary, basins. On 1 April 2021 crude reserves were 587.3 MT, mostly in the Western Offshore (37 per cent) and Assam (27 per cent), and gas reserves 1,372.6 BCM, led by the Eastern Offshore (40.6 per cent). Crude output fell from 32.2 MT in 2019-20 to 27.9 MT in 2025-26, and gross gas output was 34.8 BCM, 72 per cent of it offshore.

BasinMain fieldsShare of crude output by region, 2025-26 (per cent)
Mumbai OffshoreMumbai High, found in 1974 and producing since 1976, 160 km off MumbaiWestern Offshore 42.6
Cambay (Gujarat)Ankleshwar, Lunej (Gujarat's first oil well)Gujarat onshore 18.5
Assam-ArakanDigboi (oil found in 1889), Naharkatiya, Moran, Tripura gas fieldsAssam 15.8
Rajasthan (Barmer)Mangala (found in 2004), Bhagyam and Aishwariya of Cairn, with waxy crude. Output fell from 6.65 MT in 2019-20 to 2.95 MTRajasthan 10.5
Krishna-GodavariRazole onshore (first gas, 1983), Reliance's deepwater KG-D6 block off Kakinada, India's largest gas findEastern Offshore 9.7
Cauvery (Tamil Nadu)Onshore fields of the deltaTamil Nadu 0.9

Import Dependence and Geopolitics

  • Dependence: India imported 88.7 per cent of its crude oil in 2025-26 (provisional), up from 84.4 per cent in 2020-21, at a cost of USD 123.4 billion, and about half its gas as LNG (PPAC). Most crude passes the Strait of Hormuz, so West Asian conflict threatens supply and prices.
  • Diversification: crude sources widened from 27 to 41 countries. Russia replaced Iraq as the top supplier from January 2023, and India did not join the Western price cap on Russian crude.
  • Strategic reserves: caverns at Visakhapatnam (1.33 MT), Mangaluru (1.5 MT) and Padur (2.5 MT) hold 5.33 MT, about 9.5 days of consumption, with a second phase planned at Chandikhol (4 MT) and Padur (2.5 MT).

Refineries and Their Location

India had 22 refineries with 258.1 MT a year of capacity on 1 April 2026, second in Asia and fourth in the world (PPAC).

  • Near crude sources: Digboi (1901, Asia's first refinery), Guwahati, Bongaigaon and Numaligarh (being expanded from 3 to 9 MT, due by December 2026) in Assam, Koyali near the Cambay fields, and the 9 MT HPCL Rajasthan Refinery at Pachpadra, near the Barmer fields.
  • Near markets, fed by pipeline: Barauni, first fed by pipeline from Naharkatiya, and Mathura, Panipat, Bina and Bathinda in the northern plains.
  • Coastal, on imported crude: Reliance's Jamnagar (68.2 MT in two units, the world's largest single-site complex), Nayara's Vadinar (20 MT), Mumbai, Kochi, Mangaluru, Chennai, Visakhapatnam, Paradip and Haldia.

Natural Gas

Gas was 6.1 per cent of primary energy in 2025, against a goal of 15 per cent by 2030. Domestic gas, including coal-bed methane from West Bengal, Madhya Pradesh and Jharkhand, meets half of demand, and eight LNG terminals (53.5 MT a year on 1 April 2026), led by Dahej (17.5 MT), supply the rest. A grid of over 27,000 km carries gas inland, and city gas networks in 307 geographical areas had 9,158 CNG stations and 1.77 crore domestic piped gas connections on 31 August 2026 (PNGRB).

Hydel Power

Potential and Distribution

The Central Electricity Authority's reassessment (2017-23) put potential from schemes above 25 MW at 133,410 MW, below an earlier estimate of 148,701 MW. Arunachal Pradesh alone has 50,394 MW and the North-East 55,930 MW (42 per cent), and the northern region 46,971 MW, led by Himachal Pradesh (18,305), Uttarakhand (13,481) and Jammu and Kashmir (12,265). Large hydro capacity was 52.1 GW in July 2026, including 7.4 GW of pumped storage, so about a third of conventional potential is developed, and the North-East had only 3.0 GW.

FeatureHimalayan riversPeninsular rivers
FlowPerennial, fed by snow and glaciers as well as the monsoonSeasonal, so large storage is needed
ReliefSteep gradients and gorges suit high-head and run-of-river schemesHigh heads at the Western Ghats scarp: Koyna sends a Krishna tributary's water west to the Arabian Sea near Chiplun, and the Sharavathi drops over Jog
Share of potentialNorthern and north-eastern regions, about 77 per centSouthern and western regions, about 15 per cent, largely tapped
Major projectsBhakra (1,325 MW) and Nathpa Jhakri (1,500 MW) on the Satluj, the Tehri complex on the Bhagirathi, Subansiri Lower (2,000 MW, its eight units being commissioned in stages), Dibang (2,880 MW, under construction)Koyna (1,960 MW), Srisailam (1,670 MW) on the Krishna, Sardar Sarovar (1,450 MW) on the Narmada, Idukki (780 MW)
ConstraintsSeismicity, fractured rocks, heavy silt, landslides, glacial lake floods, remotenessCompetition with irrigation and drinking water

Pumped Storage

Pumped storage, which pumps water uphill when power is cheap and generates at peak, is the main store for solar and wind power: India had about 7 GW against a potential of about 258 GW and targets 57 GW of pumped storage by 2031-32 (Ministry of Power, 2025).

Issues

  • Displacement: Tehri displaced more than 100,000 people, and Sardar Sarovar gave rise to the Narmada Bachao Andolan.
  • Seismicity: Tehri sits in a major fault zone, and some geologists hold that the Koyna reservoir triggered the earthquake of 11 December 1967.
  • Glacial floods: a rock and ice avalanche in Chamoli (February 2021) damaged the Rishiganga project and killed workers at Tapovan Vishnugad, and the South Lhonak lake burst (October 2023) destroyed the Teesta III dam.
  • Downstream effects: protests in Assam over dam safety and daily flow swings halted Subansiri Lower from December 2011.

Basin-wide studies of cumulative impact, glacial lake monitoring, fair resettlement and pumped storage on existing reservoirs are the way forward.

Nuclear Power

The Three-Stage Programme

Homi J. Bhabha conceived the programme in the 1950s because India has about 25 per cent of the world's known thorium (846,477 tonnes in the monazite of the beach sands of Kerala, Tamil Nadu and Andhra Pradesh) but only 1 to 2 per cent of its uranium.

  1. Stage I: pressurised heavy water reactors (PHWRs) on natural uranium generate power and plutonium-239.
  2. Stage II: fast breeder reactors burn plutonium and breed uranium-233 from thorium. The 500 MWe Prototype Fast Breeder Reactor at Kalpakkam reached first criticality on 6 April 2026.
  3. Stage III: reactors running on thorium and uranium-233.

Uranium is mined at Jaduguda (from 1967) in Jharkhand and at Tummalapalle in Andhra Pradesh, and imported fuel became available after the India-US civil nuclear agreement and the Nuclear Suppliers Group waiver of 2008.

Stations, Capacity and Policy

Nuclear capacity was 8,780 MW on 30 September 2026 (MNRE, excluding 100 MW on long outage), and nuclear plants produced about 3 per cent of electricity in 2024-25. Most stations lie in western and southern states far from the coalfields.

StationStateReactors
TarapurMaharashtraTwo boiling water reactors (1969), India's first, and two 540 MW PHWRs
RawatbhataRajasthanOlder PHWRs and RAPP-7 (700 MW, commercial operation April 2025)
KalpakkamTamil NaduTwo 220 MW PHWRs and the PFBR
NaroraUttar PradeshTwo 220 MW PHWRs
KakraparGujaratTwo 220 MW PHWRs and the first indigenous 700 MW PHWRs (2023, 2024)
KaigaKarnatakaFour 220 MW PHWRs
KudankulamTamil NaduTwo 1,000 MW Russian VVERs, the largest station, with units 3 to 6 under construction

The Nuclear Energy Mission (Union Budget 2025-26) targets 100 GW by 2047, with Rs 20,000 crore for at least five indigenous small modular reactors by 2033. The SHANTI (Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India) Act, 2025, assented to on 20 December 2025, replaced the Atomic Energy Act, 1962 and the Civil Liability for Nuclear Damage Act, 2010. Companies other than government ones may now be licensed to build, own and operate nuclear power plants, while enrichment, spent fuel reprocessing, heavy water production and uranium and thorium mining stay with the Central Government.

Non-Conventional Energy Resources

Non-conventional energy sources are renewable flows, such as sunlight, wind, small streams, biomass, the earth's heat and the tides, little used for commercial power until recent decades. They are inexhaustible and nearly emission-free in use, but diffuse and intermittent, so they need land, storage and strong grids.

SourceInstalled capacity, 30 September 2026 (MNRE)
Solar171.05 GW, of which 33.41 GW grid-connected rooftop and 6.63 GW off-grid
Wind59.20 GW
Large hydro52.06 GW, including 7.43 GW of pumped storage
Bio-power11.74 GW, of which bagasse cogeneration 9.82 GW
Small hydro (up to 25 MW)5.18 GW
Total renewable299.25 GW

Why India Is Suited: The Peninsular Advantage

  • High insolation: lying largely in low latitudes, most of India receives 4 to 7 kWh per sq m per day (MNRE) on about 300 sunny days a year. The clear skies of the Thar, Kutch and the Deccan and the cold desert of Ladakh suit large solar parks.
  • Wind belts: the south-west monsoon blows strongly over the peninsula from June to September, and gaps in the Western Ghats such as the Palghat Gap funnel it into Tamil Nadu. Coastal Gujarat and Tamil Nadu, the Thar and the plateau edges of Maharashtra, Karnataka and Andhra Pradesh hold most of the potential.
  • Coastline and gulfs: a coastline estimated at 11,098 km in 2024 offers offshore wind and wave energy, and the funnel-shaped Gulfs of Khambhat and Kutch have large tidal ranges.
  • Biomass, streams and heat: crop residues and bagasse from a large farm economy, swift Himalayan and Western Ghats streams for small hydro, and hot springs along the Himalayan collision zone and in peninsular rift zones.

Solar Energy

The National Institute of Solar Energy put India's solar potential at 748 GW, assuming panels cover 3 per cent of wasteland (MNRE). The National Solar Mission, launched on 11 January 2010 under the National Action Plan on Climate Change (2008), aimed at 20 GW by 2022. In 2015 the target was raised to 100 GW, including 40 GW of rooftop solar. It was missed in 2022, mainly because rooftop lagged, and reached only on 31 January 2025. Rajasthan (28.8 GW), Gujarat (19.4 GW), Maharashtra, Tamil Nadu and Karnataka led in March 2025.

Solar parkLocationCapacityFeatures
BhadlaPhalodi district, Rajasthan2,245 MWcompleted in 2020 on about 56 sq km of the Thar, where dust storms cut panel efficiency
PavagadaTumakuru district, Karnataka2,050 MWcompleted in 2019 on land leased from farmers
Kurnool and RewaAndhra Pradesh and Madhya Pradesh1,000 MW and 750 MWultra mega solar parks
Khavda hybrid parkKutch, Gujarat30 GW plannedsolar and wind on 726 sq km of wasteland, begun in December 2020
  • Rooftop solar: PM Surya Ghar: Muft Bijli Yojana, launched in February 2024 with an outlay of Rs 75,021 crore, aims to equip one crore homes with panels supplying up to 300 units of free electricity a month.
  • Farm solar: PM-KUSUM (March 2019) set out to add 10 GW of solar plants of up to 2 MW on farmland, 17.5 lakh standalone solar pumps and the solarisation of 10 lakh grid-connected pumps, replacing diesel and giving farmers an income from surplus power.

Wind Energy

The National Institute of Wind Energy estimates gross potential at 695.50 GW at 120 m above ground level and 1,163.9 GW at 150 m, led at 150 m by Rajasthan, Gujarat, Maharashtra and Karnataka (MNRE). Installed capacity was 59.20 GW on 30 September 2026, the fourth largest in the world. Gujarat (15.2 GW) and Tamil Nadu (12.1 GW) led in February 2026. Muppandal in Kanyakumari district (about 1,500 MW) and the Jaisalmer Wind Park (1,064 MW) are the largest farms. Wind is strongest in the monsoon and helps meet the evening peak after solar output falls.

The National Offshore Wind Energy Policy was notified on 6 October 2015. MNRE estimates about 36 GW of offshore potential off Gujarat and nearly 35 GW off Tamil Nadu, and in June 2024 viability gap funding was approved for the first 1 GW, 500 MW off each coast.

Small Hydro, Bio-energy, Geothermal and Tidal Energy

  • Small hydro: IIT Roorkee estimated 21,133 MW at 7,133 sites, about half in Arunachal Pradesh, Himachal Pradesh, Jammu and Kashmir and Uttarakhand (MNRE).
  • Biomass and bagasse: MNRE's Biomass Potential Assessment Report (2021) found 228.5 MT of surplus crop residue a year and a power potential of about 28 GW, led by Punjab, Uttar Pradesh, Gujarat, Maharashtra and Madhya Pradesh. Bagasse cogeneration in sugar mills could add about 14 GW, led by Uttar Pradesh and Maharashtra.
  • Biofuels and biogas: the goal of 20 per cent ethanol in petrol (E20) by 2030 was advanced to 2025 and met that year, against 1.53 per cent in 2014. Ethanol from cane and grain raises concerns over water use and food security. The SATAT initiative (2018) set a target of 15 MT of compressed biogas from 5,000 plants by 2023.
  • Geothermal: the Geological Survey of India estimates that about 10 GW could be extracted (MNRE). Puga and Chumathang in Ladakh are the most promising fields. Others include Tattapani (Chhattisgarh), the Cambay graben (Gujarat) and Manikaran in Kullu district, which has an experimental plant. MNRE reports no installed geothermal capacity.
  • Tidal and wave: an IIT Madras and CRISIL study (2014) put theoretical potential at 12,455 MW for tidal and 41,300 MW for wave energy (MNRE). Most tidal potential lies in the Gulfs of Khambhat and Kutch, with a smaller share in the Sundarbans, where a 3.75 MW pilot at Durgaduani Creek was approved in 2011. MNRE regards ocean energy as not yet commercially viable.

Green Hydrogen and Storage

Green hydrogen is made by splitting water with renewable electricity. The National Green Hydrogen Mission, approved in January 2023 with an outlay of Rs 19,744 crore, mostly for SIGHT incentives to electrolyser makers and producers, aims at a capacity of at least 5 MT a year by 2030, needing about 125 GW of new renewable capacity. It would first replace the roughly 5 MT of grey hydrogen used in refineries and fertiliser plants, with hubs near clusters of such plants.

Storage evens out the daily swings of solar and wind. The Central Electricity Authority's National Electricity Plan (2023) projects a need for 411.4 GWh by 2031-32, 175.18 GWh from pumped storage and 236.22 GWh from batteries, and an energy storage obligation rises from 1 per cent in 2023-24 to 4 per cent by 2029-30.

Why Solar Has Lagged Behind Its Potential

  • Land: acquisition is slow, and parks compete with farming, grazing commons and wildlife habitat.
  • Intermittency: panels generate only by day and less in the monsoon, so without storage coal plants must stay ready for the evening peak.
  • DISCOM finances: state distribution companies carry large accumulated losses and debts, and delayed payments to generators raise risk and the cost of finance.
  • Transmission: the best sites in the Thar, Kutch and Ladakh lie far from load centres, and evacuation lines lag behind plants. The Green Energy Corridor scheme builds intra-state lines.
  • Slow rooftop uptake: upfront costs, rented housing and slow net-metering approvals made the 40 GW rooftop target of 2022 the main shortfall.
  • Imported equipment: developers relied on cells and modules imported largely from China. Domestic module making has grown quickly, but cell and wafer making lag far behind. The Approved List of Models and Manufacturers (2019, later extended to cells) and a Production Linked Incentive scheme of Rs 24,000 crore (2021 and 2022) push domestic manufacturing.

Solar Energy and Future Development

Solar strengthens energy security by replacing imported fuel, gives farmers daytime power for irrigation and a second income, reaches remote hamlets and islands through off-grid systems, creates manufacturing jobs, and supplies the cheap power on which green hydrogen, green ammonia and electric mobility depend. It is the core of the 500 GW target and of India's solar diplomacy.

Climate Commitments and Green Energy Initiatives

India's first Nationally Determined Contribution (NDC) under the Paris Agreement, submitted on 2 October 2015, set three goals for 2030: 40 per cent of installed electricity capacity from non-fossil sources, a cut of 33 to 35 per cent in the emissions intensity of GDP from 2005 levels, and an additional carbon sink of 2.5 to 3 billion tonnes of carbon dioxide equivalent. At COP26 in Glasgow (November 2021) the Prime Minister announced the Panchamrit: 500 GW of non-fossil capacity, half of energy requirements from renewables, a cut of one billion tonnes in projected emissions and a 45 per cent cut in emissions intensity, all by 2030, and net zero by 2070. The updated NDC approved by the Union Cabinet on 3 August 2022 raised the targets to a 45 per cent intensity cut and about 50 per cent non-fossil capacity by 2030, and added LiFE (Lifestyle for Environment).

India reached the 50 per cent target five years early: on 30 June 2025 non-fossil sources made up 242.78 GW, or 50.08 per cent, of 484.82 GW of installed capacity (MNRE, July 2025). Non-fossil capacity stood at 308.03 GW on 30 September 2026. The International Solar Alliance, launched by India and France on 30 November 2015 at COP21 in Paris and headquartered in Gurugram, has over 120 member and signatory countries and promotes One Sun One World One Grid.

Assessment: the capacity pledges have been met early, but coal still generates about 70 per cent of India's electricity because solar and wind produce for fewer hours. India cites its low per capita emissions and seeks finance and technology from developed countries.

Energy Crisis in India

India's energy crisis is a chronic gap between rising need and secure, affordable and clean supply.

  • Import dependence: net energy import dependency was 40.9 per cent in 2021-22. India imports over four-fifths of its crude oil, and imported about 90 per cent of its coking coal in 2021-22.
  • Coal shortages: in October 2021 a third of coal power plants had less than three days of stock and outages hit Uttar Pradesh, Rajasthan, Punjab, Jharkhand, Maharashtra and Kerala.
  • Rising demand: peak demand crossed 250 GW for the first time on 30 May 2024, yet per capita consumption, 1,460 kWh in 2024-25, remains far below the world average.
  • DISCOM losses: high transmission and distribution losses, theft and below-cost farm tariffs leave distribution companies in debt. Loss-making DISCOMs buy too little power and cut supply, so shortages can coexist with idle plants.
  • Regional disparity: coal lies in Jharkhand, Odisha and Chhattisgarh and wind and solar in the western and southern states, while the Ganga plain and the big cities depend on long-distance rail and transmission.
  • Energy poverty: Saubhagya (2017) connected 2.82 crore households by March 2021, but connection did not end village outages. Ujjwala (2016) reached 10 crore beneficiaries by December 2023, yet lakhs of beneficiaries bought few or no refills because of high prices, so firewood and dung remain common in rural kitchens.

Circumventing the Crisis Through Non-Conventional Energy

Domestic sun and wind replace imported fuel, and rooftop and farm solar supply power where it is used, cutting transmission losses and the farm subsidies that burden DISCOMs. Wind-solar hybrids with storage can provide round-the-clock power, ethanol and compressed biogas reduce crude and gas imports, and green ammonia can replace imported fertiliser. Land, grids, storage and imported critical minerals limit them, and coal will remain the base load for years.

Energy Efficiency and Conservation

Energy efficiency means getting the same service from less energy. A unit saved needs no fuel, imports or new plant, so efficiency is the cheapest resource.

Law and Institutions

  • Energy Conservation Act, 2001: it provides for energy norms for designated consumers in energy-intensive industries, labels for appliances and codes for buildings. The Bureau of Energy Efficiency (BEE) was set up under it on 1 March 2002 in the Ministry of Power.
  • Energy Conservation (Amendment) Act, 2022: assented to on 19 December 2022, it enables a carbon credit trading scheme, lets the government fix a minimum share of non-fossil energy for designated consumers, extends the building code, renamed the Energy Conservation and Sustainable Building Code, to large residential buildings, and brings vehicles and vessels under energy standards.
  • Carbon Credit Trading Scheme: notified on 28 June 2023. Obligated entities must meet greenhouse gas emission norms, others may buy credits voluntarily, and one credit equals one tonne of carbon dioxide equivalent.

Programmes

  • Perform, Achieve and Trade (PAT): a component of the National Mission for Enhanced Energy Efficiency (2010). Under rules notified in March 2012, designated consumers in sectors such as steel, cement, aluminium and fertilisers receive energy-saving targets, and units that beat them earn Energy Saving Certificates they can sell to those that fall short. BEE reports that PAT covers 1,333 industries using 55 per cent of industrial energy and has saved 25.78 million tonnes of oil equivalent.
  • Standards and Labelling: star labels cover 38 appliances and are mandatory for products such as air conditioners, refrigerators and LED bulbs.
  • Buildings: the Energy Conservation Building Code (2007, revised 2017) for commercial buildings, the Eco Niwas Samhita for homes and the Energy Conservation and Sustainable Building Code 2024.
  • UJALA: launched on 5 January 2015 and run by Energy Efficiency Services Limited, it has distributed over 36.87 crore LED bulbs, saving an estimated 48.42 billion kWh a year and avoiding 9,789 MW of peak demand.

Can Efficiency Resolve the Crisis?

Efficiency softens the crisis quickly: it slows demand growth, delays new plants, lowers peak load, cuts imports and emissions, and reduces household bills, as UJALA showed. It cannot resolve the crisis alone. Per capita use must rise with development, cheaper energy can encourage more use, small enterprises and farm pumps lie largely outside PAT, and states enforce building codes unevenly. The way forward pairs efficiency with supply: stronger codes, efficient farm pumps, smart meters, time-of-day tariffs, a deeper carbon market and more renewables, storage and grids.

Mineral Resources

Geology and the Mineral Belts

India's mineral map is largely a geological map. The Archaean gneisses and Dharwar schist belts of the Peninsula hold the metallic ores: banded iron formations, manganese of the Gondite and Kodurite series, gold of the Kolar and Hutti-Maski belts, copper and chromite. Cuddapah and Delhi rocks add barytes, uranium, limestone and the Khetri copper, Vindhyan rocks give limestone, building stone and the Panna diamonds, and the Gondwana basins of the Damodar, Son, Mahanadi and Godavari hold most of the coal. Laterite on the Deccan basalts and Eastern Ghats khondalites carries bauxite, Tertiary rocks hold oil, gas and lignite, and Quaternary coastal sands carry heavy mineral placers. The alluvial Indo-Gangetic plain has almost no metallic minerals.

BeltGeologyMain minerals and mining areas
Chota Nagpur-Odisha (Jharkhand, Odisha, West Bengal)Iron Ore Group of Singhbhum and Bonai-Kendujhar, ultramafic intrusions, Gondwana basinsIron ore of Noamundi, Kiriburu, Gua, Barsua and Joda, chromite of Sukinda, copper of Ghatsila, bauxite of Koraput (Panchpatmali) and Lohardaga, mica of Koderma, uranium of Jaduguda, coal of the Damodar and Mahanadi valleys
Central (Chhattisgarh, Madhya Pradesh, eastern Maharashtra)Iron formations of Bastar and Durg, Gondite manganese, Malanjkhand granitoids, Vindhyan rocksIron ore of Bailadila and Dalli-Rajhara, manganese of Balaghat, Nagpur and Bhandara, copper of Malanjkhand, coal of Korba and Singrauli, diamonds of Panna
Southern (Karnataka, Goa, Tamil Nadu, Andhra Pradesh)Dharwar schist belts, Cuddapah basin, coastal sandsIron ore of Bellary-Hospet and Goa, magnetite of Kudremukh, manganese of Sandur, gold of Hutti, barytes of Mangampet, magnesite of Salem, placers of Kerala and Kanyakumari
Aravalli (Rajasthan, Gujarat)Aravalli and Delhi fold belts, Cambay and Barmer basinsLead-zinc of Rampura Agucha, Sindesar Khurd, Rajpura-Dariba and Zawar, copper of Khetri, rock phosphate of Jhamarkotra, tungsten of Degana, marble of Makrana, oil and lignite
Himalayan (Jammu and Kashmir to the North-East)Young folded rocks, Tertiary basinsMagnesite of Uttarakhand, limestone, lithium at Salal-Haimana (Reasi), Tertiary coal of Meghalaya, Assam oil, base metals left unworked in difficult terrain

The correlation explains the mineral economy. Dharwar iron ore beside Gondwana coking coal made the north-eastern plateau the steel heartland. Because most ores lie in forested tribal districts, mining collides with forest and tribal rights. Where geology is unfavourable India is short: its copper ore averaged only 0.83 per cent copper in 2023-24, and it imported all its lithium, cobalt and nickel in 2020.

Metallic Minerals

The Indian Minerals Yearbook 2024 (Indian Bureau of Mines) gives resources as on 1 April 2020 and production for 2023-24. In 2023 India ranked third in the world in iron ore and chromite, fifth in manganese ore and sixth in bauxite.

MineralResources (2020)Production (2023-24)Main mines
Iron ore: haematite (higher grade) and magnetiteHaematite 24,057 MT: Odisha 39 per cent, Jharkhand 20, Chhattisgarh 19, Karnataka 12. Magnetite 11,227 MT: Karnataka 69.5 per cent277.3 MT: Odisha 53.7 per cent, Chhattisgarh 16.6, Karnataka 14.8Bonai-Kendujhar belt, Noamundi, Kiriburu, Bailadila, Bellary-Hospet, Goa. Kudremukh, inside a national park, was closed
Manganese503.6 MT: Odisha 34 per cent, Karnataka 253.38 MT: Madhya Pradesh and Maharashtra 30.6 per cent each, against imports of 5.59 MTBalaghat, Nagpur-Bhandara (MOIL), Kendujhar, Sandur
Bauxite4,958 MT: Odisha 41 per cent, Chhattisgarh 20, Andhra Pradesh 1223.97 MT: Odisha about 73 per centPanchpatmali (Koraput, NALCO), Lohardaga, Surguja, Jamnagar, Kolhapur
Copper1.66 billion tonnes of ore: Rajasthan 52 per cent, Madhya Pradesh 23, Jharkhand 153.78 MT of ore, all by Hindustan Copper, against concentrate imports of 10.16 lakh tonnesMalanjkhand (Balaghat), Khetri (Jhunjhunu), Ghatsila
Chromite332 MT, over 96 per cent in Odisha3.15 MT, all from OdishaSukinda valley (Jajpur), Nuasahi
Lead and zinc766.5 MT of ore, 89 per cent in Rajasthan16.5 MT of ore, enough for self-sufficiency in zinc but not leadRampura Agucha (Bhilwara), Sindesar Khurd, Rajpura-Dariba, Zawar
Gold518 MT of ore: Bihar 43 per cent (inferred only), Rajasthan 25, Karnataka 201,603 kg, 97 per cent from KarnatakaHutti (Raichur). Kolar Gold Fields closed on 28 February 2001

The pattern shows the sector's problems: surplus iron ore (46.4 MT was exported in 2023-24, and fines made up 73 per cent of output) beside shortages of copper, lead and high-grade manganese, low-grade ores needing beneficiation, and output concentrated in Odisha.

Non-metallic Minerals

Limestone resources of 2,27,589 MT are led by Karnataka (24 per cent), Andhra Pradesh (13) and Rajasthan (12), and output reached 452 MT in 2023-24. Andhra Pradesh holds 41 per cent of mica resources, in Nellore, while Koderma in Jharkhand was once the mica capital of India, and mica was reclassified as a major mineral in February 2025. Uttarakhand (52 per cent) and Tamil Nadu (34) hold most magnesite, and Andhra Pradesh 92 per cent of barytes.

Critical Minerals

Critical minerals combine high economic importance with high supply risk. A Ministry of Mines committee listed 30 for India in June 2023: antimony, beryllium, bismuth, cadmium, cobalt, copper, gallium, germanium, graphite, hafnium, indium, lithium, molybdenum, nickel, niobium, phosphorus, platinum group elements, potash, rare earth elements, rhenium, selenium, silicon, strontium, tantalum, tellurium, tin, titanium, tungsten, vanadium and zirconium.

  • Economic development: lithium, cobalt, nickel and graphite go into batteries for electric vehicles and storage, silicon, gallium and germanium into solar cells and semiconductors, and rare earth magnets into wind turbines and motors. The targets of 500 GW of non-fossil capacity by 2030 and net zero by 2070 depend on them, as do electronics and fertilisers.
  • National security: tungsten, titanium, beryllium and rare earths are needed for defence, aerospace and nuclear technology.
  • Import dependence: in 2020 India imported all its lithium, cobalt, nickel, vanadium, niobium, germanium, rhenium, beryllium, tantalum and strontium, and 60 per cent of its natural graphite. Refining is concentrated in China, and Indian electric vehicle makers faced shortages of rare earth magnets in 2025.

India has responded on several fronts.

  • Law: the Mines and Minerals (Development and Regulation) Amendment Act, 2023 removed lithium, beryllium, titanium, niobium, tantalum and zirconium minerals from the list of twelve atomic minerals reserved for public sector mining, let the Union government auction 24 critical and strategic minerals with revenue going to the states, and created an exploration licence for deep-seated and critical minerals. The first offshore auction (November 2024) offered 13 blocks, including polymetallic nodules off Great Nicobar.
  • National Critical Mineral Mission: approved on 29 January 2025 with Rs 16,300 crore of government spending and Rs 18,000 crore expected from public sector undertakings over seven years, covering exploration, fast-track approvals, recovery from tailings, overseas assets, a stockpile, processing parks, recycling and a Centre of Excellence.
  • Overseas assets: Khanij Bidesh India Limited (KABIL), a joint venture of NALCO, Hindustan Copper and MECL, agreed in January 2024 to explore five lithium brine blocks of about 15,703 hectares in Catamarca, Argentina.
  • Partnerships: India joined the United States-led Minerals Security Partnership in June 2023.
  • Domestic finds: in February 2023 the Geological Survey of India reported 5.9 MT of inferred lithium resources (G3 stage) at Salal-Haimana, Reasi, but auctions in December 2023 and July 2024 failed for want of bidders.

Problems of Mining

  • Displacement: the richest deposits lie in Scheduled Areas, and in the Niyamgiri case (2013) the Supreme Court left bauxite mining to the gram sabhas, which rejected it.
  • Illegal mining and environment: mining in Bellary was banned in 2011 after the Karnataka Lokayukta exposed illegal extraction, a ban in Goa was lifted in 2014 with an annual cap of 20 MT, and the Shah Commission found 94 of 192 iron ore leases in Odisha without environmental clearance.
  • District Mineral Foundations: created by the 2015 amendment of the mining law to return revenue to affected areas, they had collected about Rs 90,730 crore by March 2024 and spent Rs 49,845 crore, often on works far from affected villages.

Biotic Resource Regions

Biotic resources are the plants, animals and micro-organisms used for food, timber, fodder, fibre, medicine and genes. The standard regionalisation, by W.A. Rodgers and H.S. Panwar of the Wildlife Institute of India (1988), divides India into ten biogeographic zones, later subdivided into 27 provinces.

Zone (share of area)Biotic resourcesMain problems
Trans-Himalaya (5.6 per cent)Cold desert pastures, pashmina goats, snow leopard, kiangOvergrazing, tourism waste, warming
Himalaya (6.4 per cent)Temperate and alpine forests, medicinal herbs, musk deer, red pandaDeforestation, landslides, roads and hydropower, overharvest of herbs
Desert (6.6 per cent)Thorn scrub, khejri, great Indian bustard, wild assDesertification, overgrazing, power lines that kill bustards
Semi-arid (16.6 per cent)Dry forest, grasslands, Asiatic lion, blackbuckGrasslands treated as wasteland, a single lion population
Western Ghats (4.0 per cent)Evergreen and shola forests, spices, high endemismPlantations, quarrying, hydel projects, unsettled Ecologically Sensitive Area proposals (Gadgil 2011, Kasturirangan 2013)
Deccan Peninsula (42.0 per cent)Teak and sal forests, minor forest produce, tiger, elephantMining and dams in tribal forests, broken corridors, fire, conflict
Gangetic Plain (10.8 per cent)Wetlands, terai grasslands, river dolphin, gharialConversion to farmland, drained wetlands, polluted rivers
Coasts (2.5 per cent)Mangroves, estuaries, fisheries, olive ridley turtleMangrove loss to aquaculture and ports, erosion, overfishing
North-East (5.2 per cent)Evergreen forests, bamboo, orchids, rhinocerosShortened jhum cycles, hunting, dams, floods
Islands (0.3 per cent)Evergreen forests, coral reefs, dugong, Nicobar megapodeInfrastructure such as the Great Nicobar project, coral bleaching, tsunami risk

Common problems are habitat loss and fragmentation, overuse of commons, invasive species and climate change, worst in the poorest forest-dependent districts. Each zone needs its own plan: protected areas and corridors, community rights and benefit-sharing, protection of grasslands and wetlands, and regulated tourism and infrastructure in mountains, coasts and islands.

Marine Resources and the Blue Economy

Marine Resources

  • Fisheries: India is the world's second-largest fish producer. In July 2025 the Ministry of Fisheries reported a record 195 lakh tonnes, with inland fisheries nearly 75 per cent and over 3 crore fishers and fish farmers. The Pradhan Mantri Matsya Sampada Yojana, launched in September 2020 with about Rs 20,000 crore over four to five years, funds harbours, cold chains and aquaculture. Inshore waters are overfished while the deep sea is underused.
  • Oil, gas and offshore minerals: Mumbai High and the Krishna-Godavari basin yield oil and gas, and offshore blocks of sand, lime mud and nodules were first put up for auction in 2024.
  • Beach placers: ilmenite, rutile, zircon, sillimanite, garnet and monazite are concentrated at Chavara (Kerala), Manavalakurichi (Tamil Nadu), Chhatrapur and Brahmagiri (Odisha) and Bhavanapadu (Andhra Pradesh). Ilmenite resources were 687.6 MT (2020) and monazite, the source of rare earths and thorium, 12.73 MT (2021).
  • Polymetallic nodules: India became the first pioneer investor in 1987 with about 1,50,000 sq km in the Central Indian Ocean Basin and, under its 2002 contract with the International Seabed Authority, retains 75,000 sq km. The nodules, estimated at about 380 MT, contain manganese, nickel, copper and cobalt.

The Blue Economy

The Ministry of Earth Sciences' Draft Blue Economy Policy (February 2021) treats the blue economy as the ocean resources and coastal economic infrastructure within India's jurisdiction, across an Exclusive Economic Zone of over 2 million sq km. Its seven themes are ocean accounting and governance, marine spatial planning and tourism, fisheries, manufacturing and services, shipping, deep-sea mining and offshore energy, and security. The Deep Ocean Mission, approved in June 2021 at Rs 4,077 crore for five years, is developing a submersible to carry three people to 6,000 metres (Samudrayaan) and a system to mine nodules from that depth, and is exploring hydrothermal sulphides on mid-ocean ridges. Fisheries schemes, Sagarmala and offshore auctions complete the effort.

The initiatives are valid in principle, since the ocean offers food, jobs, energy, critical minerals and strategic reach. Their impact is mixed. Fish output and coastal infrastructure have grown, but inshore stocks are under strain, ports and aquaculture clear mangroves and displace fisherfolk, and commercial nodule mining depends on an exploitation code that the International Seabed Authority had yet to adopt when the mission began, and threatens deep-sea life. Marine spatial planning, ecosystem-based fisheries management and protection of mangroves as blue carbon would make it sustainable.

Forest and Wildlife Resources

Forest Cover and Forest Produce

The India State of Forest Report 2023 (released December 2024, still the latest in October 2026) puts forest cover at 7,15,343 sq km (21.76 per cent of the geographical area) and tree cover at 1,12,014 sq km (3.41 per cent), together 25.17 per cent, short of the one-third goal of the National Forest Policy 1988. Of the 1,445 sq km gained since 2021, only 156 sq km was forest. Madhya Pradesh, Arunachal Pradesh and Chhattisgarh have the largest forest areas, and Lakshadweep (91.33 per cent) and Mizoram (85.34 per cent) the highest shares.

Forests yield timber, fuelwood, fodder, bamboo (on 1,54,670 sq km) and minor forest produce such as tendu leaves, mahua, sal seeds, lac and honey, on which tribal households, and women especially, depend. Forest carbon stock was 7,285.5 MT in 2023.

Social Forestry, Agroforestry and Joint Forest Management

Social forestry, a term of the National Commission on Agriculture (1976), aimed to grow fuelwood, fodder and small timber outside forests through farm forestry, village woodlots and plantations along roads, canals and railways. Agroforestry combines trees with crops and livestock. Both fell short.

  • Market capture: farm forestry became commercial eucalyptus planting for pulp by larger farmers, as in Gujarat and Karnataka, leaving the poor little fuelwood or fodder.
  • Top-down management: forest departments chose sites and species, so villagers felt no ownership.
  • Wrong species: exotics such as eucalyptus and Prosopis juliflora replaced fodder and fruit trees.
  • Loss of commons: planting on grazing land excluded the landless, and benefits went to elites.
  • Tenure and regulation: insecure tenancy and rules on felling and transporting farm timber deterred planting.

Joint Forest Management grew from the Arabari experiment in West Bengal's sal forests, where forester Ajit Kumar Banerjee shared produce and profit with villagers in return for protection. Following the National Forest Policy 1988, the guidelines of June 1990 let forest protection committees guard degraded forest for non-timber produce and a share of timber revenue. Many sal forests recovered, but the committees had no legal standing.

The Forest Rights Act, 2006

The Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006, in force from 31 December 2007, set out to correct the historical injustice that had made forest dwellers encroachers on their own land. It recognises individual rights to land cultivated on 13 December 2005, up to 4 hectares, community rights over minor forest produce, grazing and fish, and the right to manage community forest resources. Other traditional forest dwellers must show three generations (75 years) of residence. The gram sabha initiates claims, and people may be moved from critical wildlife habitats only with consent.

By 30 June 2026 the Ministry of Tribal Affairs reported 54,01,561 claims and 25,42,359 titles (1,24,162 of them community titles) covering about 2.38 crore acres. Of 43,55,591 claims disposed of, over 18 lakh were not granted. Chhattisgarh, Odisha and Madhya Pradesh lead, while Karnataka issued only 16,700 titles against 2,95,176 claims.

  • Security of tenure: titles protect cultivators from eviction and harassment.
  • Community control: Mendha-Lekha in Gadchiroli won control of its bamboo.
  • Voice against diversion: the Niyamgiri gram sabhas rejected bauxite mining.
  • Limits: mass rejections, community rights lagging individual titles, forest department resistance and tension with inviolate wildlife areas. In February 2019 the Supreme Court ordered rejected claimants evicted, then put the order on hold for review.

Compensatory Afforestation (CAMPA)

Agencies diverting forest land pay for compensatory planting. After the Supreme Court ordered a fund and authority (CAMPA) in 2001, the Compensatory Afforestation Fund Act, 2016 and its 2018 rules placed the money in non-lapsable public accounts, and Rs 47,436 crore went to states in August 2019. Plantations on degraded land rarely replace natural forest.

Wildlife Resources and Their Conservation

In January 2023 India had 106 national parks and 567 wildlife sanctuaries, and protected areas covered 1,73,629.52 sq km, about 5.28 per cent of the country (Wildlife Institute of India). There were 58 tiger reserves as of March 2025, covering about 2.5 per cent of the area, and 33 elephant reserves in 14 states.

Project Tiger began in 1973 with nine reserves. The All India Tiger Estimation 2022 counted an average of 3,682 tigers (range 3,167 to 3,925), up from 2,967 in 2018, almost 75 per cent of the world's wild tigers, led by Madhya Pradesh (785), Karnataka (563) and Uttarakhand (560), though numbers fell in the Western Ghats. Project Elephant (1992) protects elephants and their corridors. The 2017 count gave 29,964 elephants, and the first DNA-based estimate (October 2025) gave 22,446, a new baseline not comparable with the old method.

Conservation faces several problems.

  • Habitat loss: mines, dams, roads and railways cut corridors, and many tigers and most elephants range outside protected areas.
  • Human-wildlife conflict: crop raiding and deaths turn people against wildlife, despite advisories asking for relief within 24 hours.
  • Poaching and trade: poaching wiped out Sariska's tigers in 2005.
  • People in parks: contested relocation and tension between forest rights and inviolate core areas.
  • Small populations: the Asiatic lion of Gujarat and the great Indian bustard face disease, accidents and inbreeding, and Lantana, grazing and fire degrade habitat.
  • Management gaps: staff shortages, limited funds and pressure for development clearances.

Measures to prevent extinction of rare species combine law, habitat and science.

  • Legal protection: Schedule I of the Wild Life (Protection) Act, 1972, conservation and community reserves (2002) and the statutory National Tiger Conservation Authority (2006).
  • Species projects: Project Tiger, Project Elephant, Project Crocodile (1975) and Project Snow Leopard (2009), linked by corridors.
  • Breeding and reintroduction: conservation breeding of vultures and gharials, and the return of the cheetah, extinct in India since 1952, with eight animals from Namibia released at Kuno on 17 September 2022 and twelve from South Africa in February 2023. Gujarat has created a second home for lions at Barda, and lions rose from 674 in 2020 to 891 in 2025.
  • Communities: eco-development, forest rights, tourism revenue and prompt compensation.
  • Monitoring: camera-trap and DNA estimation and intelligence-led anti-poaching.

Technology and Resource Utilisation

  • Coal and power: mechanised opencast mining lifted output by about 70 per cent in ten years, supercritical units burn less coal per unit, and HVDC lines carry pithead power far away.
  • Oil and gas: offshore and deepwater drilling opened Mumbai High and KG-D6, and enhanced recovery (Mangala) matters because Indian fields recover only 30 to 35 per cent of oil in place.
  • Nuclear and hydro: indigenous 700 MW PHWRs, fast breeders that stretch scarce uranium and pumped storage widen the usable resource base.
  • Minerals: remote sensing and airborne geophysical surveys locate deposits, and beneficiation and pelletisation make low-grade ore and iron ore fines usable.
  • Water and farming: drip and sprinkler irrigation, aquifer mapping and satellite crop monitoring raise output per unit of water, while cheap pumps also drove groundwater overdraft.

Technology widens the resource base, but it can also speed depletion, so it works best with regulation and prices that reflect scarcity.

Still unsure about something here?Ask the Geography AI. It answers from the standard books and shows you the page.